Skip to main content

Search

Council City of Salisbury Logo Placeholder
Showing 61 – 80 of 2696 results

19 03 2018 agenda and reports resources and governance committee

Document
PDF | 1.9MB
on the 23 rd October 2017, Council requested a staff report on what principles of development control and other provisions in the Development Plan, Building Code or Development Act are in relation

CAP 24 09 2024 MINUTES ENDORSED

Document
PDF | 240KB
, (telephone number 8204 0289). Building Rules Consent and Approval Still Required Building Consent and Development Approval must be obtained within 24 months from the date of this Notification, unless

Salary Register

Document
PDF | 461KB
000160 - Development Officer Building MOA Level 5 Year 1 $95,931.00 001274 - Coordinator Parks & Landscape MOA Level 5 Year 1 $95,931.00 001326 - Development Compliance Officer - Planning MOA Level 5

2016 Minutes Development Assessment Panel 3210231

Document
PDF | 70KB
and sheds (2) and Residential Development (Residential Flat Building) Comprising Six (6) Two Storey Dwellings at 12-14 Ada Street, Salisbury for Rendition Homes Pty. Ltd. REPRESENTORS Representor, Ms

Guidelines For Home Based Food Businesses

Document
PDF | 865KB
of all final products Where building work is proposed or required, a Development Application will be required to be lodged with Council’s Development Services Department, and all necessary approvals must

8941 city of salisbury community survey 2016

Document
PDF | 1.3MB
, services for the disabled and services for the youth. However economic development, planning and building and verge cutting were earmarked for as the areas where service improvement would likely produce
Council Plans Documents Reports Policies 04

Freedom of Information

Page
] One was a request for copies of any records related to the presence or use of asbestos at a property located at Ingle Farm and copies of all development applications, building plans

2017 minutes policy and planning committee 3569825

Document
PDF | 131KB
Development 1.2.1 Building Upgrade Finance Moved Mayor G Aldridge Seconded Cr G Caruso 1. In principle support be given to entering into building upgrade agreements as enabled by the Local Government (Building

Council assessment panel minutes 29 01 2020

Document
PDF | 345KB
the building; b) The post-development rate of discharge from the site shall not exceed the rate of discharge in pre-development conditions; c) The stormwater drainage system shall incorporate Water

Stc renewal bulletin november 2011 final

Document
PDF | 624KB
OPTION THREE RELOCATE THE HEART OF STC TO THE INTERCHANGE Heart of Centre (shaded area): Development is focused around John Street and the Civic Square Height of buildings: John Street would be developed

Draft salisbury town centre structure plan attachment a july 2012

Document
PDF | 615KB
OPTION THREE RELOCATE THE HEART OF STC TO THE INTERCHANGE Heart of Centre (shaded area): Development is focused around John Street and the Civic Square Height of buildings: John Street would be developed

2017 minutes policy and planning committee 3630550

Document
PDF | 115KB
of Salisbury Minutes - Policy and Planning Committee Meeting - 21 August 2017 Economic Development 1.2.1 Building Upgrade Finance Mayor G Aldridge left the meeting at 07:06 pm. Cr D Bryant entered

29032022 Minutes Council Assessment Panel

Document
PDF | 397KB
and Residential Building Sites”, prepared by the Environment Protection Authority. No works shall commence until prior written approval has been issued by Council’s Principal Development Engineer. Page

CAP 29102024 AGN 2552 AT

Document
PDF | 283KB
Rules Consent and Approval Still Required Building Consent and Development Approval must be obtained within 24 months from the date of this Notification, unless this period has been extended

16 06 2020 agenda and reports council assessment panel r

Document
PDF | 348KB
adjacent the building; b) The post-development rate of discharge from the site shall not exceed the rate of discharge in pre-development conditions; c) The stormwater drainage system shall

Final emergency management plan

Document
PDF | 1.8MB
disaster risk and managing residual risk, all of which contribute to strengthening resilience and therefore to the achievement of sustainable development Incident Operations – Actions undertaken

Emergency Management Plan 2021 2024

Document
PDF | 1.0MB
and reducing existing disaster risk and managing residual risk, all of which contribute to strengthening resilience and therefore to the achievement of sustainable development Incident Operations – Actions

14 09 2020 agenda and reports innovation and business development sub committee

Document
PDF | 1.1MB
to the Innovation and Business Development Sub Committee that: a. details the current status of the existing operations covering building, property and land development related functions; b. identifies

Community perceptions 2020 final for website

Document
PDF | 2.3MB
Development Planning and Building Services for the youth Services for the disabled Road maintenance Verge cutting Footpath maintenance SATISFACTION WITH SERVICES 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0
Development Council Major Strategic Property Walkleys Road Corridor

Walkleys Road Corridor – Revocation of Community Land Classification and Road Closure

Consultation
areas of Council owned land that are suitable for future residential development to continue building on the success of creating award winning thriving communities. The land in the Walkleys Road