Skip to main content

Search

Council City of Salisbury Logo Placeholder
Showing 121 – 140 of 497 results

Strategic Growth Framework Waterloo Corner Bolivar Corridor July 2022 Key Findings Summary

Document
PDF | 8.7MB
directly. 4 CITY OF SALISBURY Strategic Growth Framework • Promote and encourage economic growth and job creation for the City of Salisbury community. • Identify infrastructure funding and delivery

Riverwalk fact sheet

Document
PDF | 162KB
economic output with 45 jobs created during construction PARAFIELD GARDENS, SA RESIDENTIAL COMPLETED 2017 The project was supported by the Australian Government, Department for Social Services through the Housing Affordability Grant Fund.

Guidelines For Home Based Food Businesses

Document
PDF | 865KB
, dishwashers. 3. The size of the kitchen and storage area should be adequate for the intended use. 4. Hot and cold water must be connected to the required sinks and hand basin and the hot water system

Pack d2 propagation from seed

Document
PDF | 558KB
, the type of environment the punnets are positioned in needs to be considered. Hot and/or windy days can lead to increased evaporation and dry the soil out, therefore risking the survival

Bedbugsfactsheet

Document
PDF | 88KB
should be washed in hot water (at least 60 o C) and/or heated ironing or drying. Mattresses can be difficult to treat effectively and may require specialised advice from a pest control company. Reduce
Services Emergency Management Other Hazards

Other Hazards

Page
and uncomfortable hot and unusually humid weather. During the 20th century, heatwaves have caused more deaths in Australia than any other natural hazard. Heatwaves can have a detrimental impact on communities

Emerald green fact sheet

Document
PDF | 203KB
open space retained • Indicative value $14.8 million • $56.5 million in increased economic output with 150 jobs created during construction The project was supported by the Australian Government, Department for Social Services through the Housing Affordability Grant Fund.

Northern Adelaide Financial Inclusion Action Plan 2022 2023

Document
PDF | 3.1MB
and affiliated businesses. The effects of these direct and indirect job losses from the region saw unemployment rise above the national benchmark, compounding issues for a demographic in which sections

16 07 2018 agenda and reports resources and governance committee

Document
PDF | 1.6MB
South Australia, nationally and internationally. 1.3 Have a thriving business sector that supports community wellbeing, is globally oriented and creates job opportunities. Council had previously

26042023 Minutes Council Assessment Panel

Document
PDF | 252KB
, in accordance with all of the following: i. Connected to at least 60% of the roof area; and ii. Connected to one toilet; iii. The laundry cold water outlets or hot water service; and iv. Have a minimum tank

26042023 Minutes Council Assessment Panel

Document
PDF | 252KB
to at least 60% of the roof area; and ii. Connected to one toilet; iii. The laundry cold water outlets or hot water service; and iv. Have a minimum tank capacity of 2,000 litres for retention; and v

The reserve fact sheet

Document
PDF | 145KB
involved construction of 76 dwellings. • 87% affordable housing • 11,618m 2 open space retained • Indicative value $6.2 million • $49.06 million in increased economic output with 147 jobs created

Greentree walk fact sheet

Document
PDF | 170KB
Sensitive Urban Design street infrastructure was trialled • Indicative value $11.8 million • $52.2 million in increased economic output with 148 jobs created during construction PARALOWIE, SA

FINAL Issue 25 October 2022 to January 2023 WEB

Document
PDF | 2.4MB
, nice and warm without being hot.” 4. “Dapper, smiling, helpful.” 5. “Don’t change a thing.” CAROL BARBER (JYC) 1. “Ukulele.” 2. “I enjoy the shopping and the friendly faces out and about.” 3. “I really

10 08 2021 agenda and reports youth council

Document
PDF | 444KB
media. 709 were received over the week long art competition. 3.4 Upcoming programs and events: JULY – SEPTEMBER 2021 PROGRAM DATE ADDITIONAL INFORMATION Prepare for your first job workshop JUNE 9 TH

2024 JYC and Pine Lakes Weekly Program

Document
PDF | 361KB
- 1.00pm Frozen Takeaway Meals Pick-up between Pre-order or select from freezer 10.00am – 2.30pm Hot Takeaway Meals Pick-up between 12.30pm – 2.00pm Orders from 8.30am ACTIVITY TIME NOTES OTHER COMMUNITY
Council About Quick Facts Salisbury Aerial

Quick Facts

Page
of Gulf St Vincent to the Para Escarpment and the foothills of the Mt Lofty Ranges. The region enjoys a typical Mediterranean climate, having cool, wet winters and warm to hot, dry summers. Lifestyle

Edition 49 Salisbury Aware Autumn 2016

Document
PDF | 4.2MB
of medical lasers. Construction has also commenced on the $985 million Northern Connector, which is expected to create about 480 jobs during each year of construction. The Northern Connector Jobs

2016 agenda and reports program review sub committee 3361624

Document
PDF | 527KB
job creation) and the business advisory services we provide could be better aligned This appears to be largely the result of: �� �� �� There is no filtering of businesses through imposition